Field planning model · v0.2
Size the capture.
Before you deploy.
Turn a route, a property count and a capture standard into a practical plan for robot-hours, batteries, data and budget.
Planning baseline0.6 m/sOutdoor capture speed70–105 GBRaw data per robot-hour
01 / Project definition
Build a field-ready estimate.
Route length drives the model. Every output updates instantly; advanced assumptions stay fully editable.
Capture briefCap d’Antibes baseline
ha
km
sites
m²
levels
unit
02 / Cost anatomy
€542
Planning estimate before tax. Robot depreciation is currently €10 per operating hour; QA adds 1.5 operator-hours.
01Robot depreciation€36
02Capture operators€142
03Reconstruction compute€48
04Working storage€6
05Quality assurance€60
06Travel & logistics€250
Method note
Outdoor time = route ÷ 0.6 m/s × 1.25. Indoor time = estimated indoor route ÷ 0.35 m/s × 1.4. Day + evening doubles capture passes. Quality presets model route redundancy; they do not change the sensor sampling interval. Terrain, permits, crowds, weather and final SLA can move a field estimate.