Field planning model · v0.2

Size the capture.
Before you deploy.

Turn a route, a property count and a capture standard into a practical plan for robot-hours, batteries, data and budget.

Planning baseline0.6 m/sOutdoor capture speed70–105 GBRaw data per robot-hour

01 / Project definition

Build a field-ready estimate.

Route length drives the model. Every output updates instantly; advanced assumptions stay fully editable.

Capture briefCap d’Antibes baseline
Capture scope
Lighting passes
ha
km
sites
levels
unit
Capture standard

02 / Cost anatomy

€542

Planning estimate before tax. Robot depreciation is currently €10 per operating hour; QA adds 1.5 operator-hours.

01Robot depreciation€36
02Capture operators€142
03Reconstruction compute€48
04Working storage€6
05Quality assurance€60
06Travel & logistics€250
Method note

Outdoor time = route ÷ 0.6 m/s × 1.25. Indoor time = estimated indoor route ÷ 0.35 m/s × 1.4. Day + evening doubles capture passes. Quality presets model route redundancy; they do not change the sensor sampling interval. Terrain, permits, crowds, weather and final SLA can move a field estimate.